行業(yè)資訊 所在位置- 首頁(yè)-新聞中心-行業(yè)資訊鋼筋桁架樓承板安裝使用要注意什么?

鋼筋桁架樓承板安裝使用要注意什么?

發(fā)布時(shí)間:2023-05-20 來(lái)源:http://www.gp552.com/

施工順序
Construction sequence
平面施工順序:每層鋼筋桁架樓承板的鋪設(shè)宜根據(jù)施工圖起始位置向一個(gè)方向鋪設(shè),后處理邊角部分。
Plane construction sequence: The laying of each layer of steel truss floor support plate should be carried out in one direction according to the starting position of the construction drawing, and finally, the edges and corners should be treated.
立面施工順序:隨主體結(jié)構(gòu)安裝施工順序鋪設(shè)相應(yīng)各層的鋼筋桁架樓承板。
Facade construction sequence: Lay corresponding steel truss floor support plates for each floor in accordance with the installation and construction sequence of the main structure.
鋼筋桁架樓承板安裝
Installation of steel bar truss floor support plate
適宜在下一節(jié)鋼柱及配套鋼梁安裝完畢后進(jìn)行。
It is suitable to proceed after the installation of the next section of steel columns and supporting steel beams.
樓板鋪設(shè)前
Before laying the floor slab
濟(jì)南樓承板
應(yīng)按圖紙所示的起始位置放設(shè)鋪板時(shí)的基準(zhǔn)線。對(duì)準(zhǔn)基準(zhǔn)線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應(yīng)緊密,保證澆筑混凝土?xí)r不漏漿。
The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
鋼筋桁架樓承板就位之后
After the steel truss floor support plate is in place
應(yīng)將其端部的豎向鋼筋及底模與鋼梁點(diǎn)焊牢固。沿板寬度方向?qū)⒌啄Ec鋼梁點(diǎn)焊,焊接采用手工電弧焊,間距不大于300mm。
The vertical reinforcement and bottom formwork at its end should be firmly spot welded with the steel beam. Spot weld the bottom formwork with the steel beam along the width direction of the plate. Manual arc welding is adopted for welding, and the spacing is not more than 300mm.
樓板鋪設(shè)前
Before laying the floor slab
應(yīng)按圖紙所示的起始位置放設(shè)鋪板時(shí)的基準(zhǔn)線。對(duì)準(zhǔn)基準(zhǔn)線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應(yīng)緊密,保證澆筑混凝土?xí)r不漏漿。
The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
本文由濟(jì)南樓承板提供技術(shù)支持,更多的詳細(xì)精彩內(nèi)容請(qǐng)點(diǎn)擊我們的網(wǎng)站  http://www.gp552.com ,我們將會(huì)全心全意為您提供滿意的服務(wù)。
This article is supported by Jinan Building Support Board. For more detailed and exciting content, please click on our website http://www.gp552.com We will wholeheartedly provide you with satisfactory service.
亚洲精品国产AV天美传媒| bytv跳转接口点击进入网页| 亚洲精品在线观看| 我的真實亂倫故事| 调教小奴高潮惩罚play露出| 精品一区二区三区自拍图片区| 视频播放器大全高清视频| 特黄a级毛片| 亚洲av无码专区亚洲av桃| 麻豆高清免费国产一区| 亚洲国产精品久久久久秋霞小| 久久久久国产精品熟女影院| 亚洲一区二区三区写真| 中国娇小与黑人巨大交| √天堂资源地址在线官网| 春药play揉屁股play男男| 娇妻销魂的交换经历| 3d漫画全彩我的熟妇老师| 出轨熟女人妻hd中文| 中文字幕av伊人av无码av| 绿帽娇妻在卧室疯狂的呻吟| 欧美成人一区二区三区在线观看| 精品亚洲成a人无码成a在线观看| 无码国产69精品久久久久APP| 国产h视频在线观看| 最近免费中文字幕mv在线视频3| 精品人妻伦九区久久aaa片69| 蜜臀av在线播放| 一受多攻同做h嗯啊巨肉| 三上悠亚人妻中文字幕在线| 狂躁美女大bbbbbb视频| 女主放荡h乱np自慰| 亚洲小鲜肉与欧美猛男的区别 | 精品香蕉99久久久久网站| 亚洲丰满熟女一区二区哦| 人妻少妇看a偷人无码精品| 国产VA免费精品高清在线观看| 无人区乱码一区二区三区| 337p日本欧洲亚洲大胆精品| 最近韩国日本免费观看免费| 麻麻张开腿让我爽了一夜|